Guide · NYC rules

Local Laws 92 and 94: green and solar roof rules

New York requires a sustainable roofing zone across the whole roof on certain jobs, met with solar, a green roof, or both. The detail that matters to most owners is which work triggers it, and how much of the roof is exempt.

Updated · written from the official code text, with links to every source

What the requirement actually is

The Building Code puts it in one line: a sustainable roofing zone is required on 100 percent of the roof. The Department of Buildings describes Local Laws 92 and 94 as requiring that zone to be covered by green roofs, solar energy systems, or a mix of the two.

Which of the two you owe is decided by the code, not by preference:

  • Solar. A contiguous area of the zone under 200 square feet, or under 100 square feet in a building of five stories or fewer whose dominant occupancy is residential, must have at least a solar photovoltaic system where that system would hold at least 4kW of generating capacity, as determined by the Department.
  • Green roof. Where the zone is low-slope, meaning a slope of two units vertical in 12 or less, and would hold less than 4kW of solar capacity, it must have at least a green roof system.

In plain terms: enough sun and space, and the answer is solar; not enough, and a flat area gets planting instead.

Which work triggers it

This is the question that decides whether the rule is your problem this year or not at all. The Department lists three situations:

TriggerWhat it means
New buildingsThe requirement applies from the start, so the roof is designed around it.
New roofs created by enlarging an existing buildingAn extension or added storey creates roof area that is treated as new.
Replacing a whole roof assembly, deck included, on an existing buildingThis is the one that catches existing buildings. It is about the structure underneath, not about swapping a worn membrane.

Note what the third one says and does not say. It is written about an existing building whose whole roof assembly, deck and all, is being replaced. A great deal of commercial roofing is lighter than that: strip the old covering, dry and re-insulate, lay a new membrane on a deck that stays where it is. Whether a particular job crosses into assembly replacement is decided by the professional who files it, and on a large roof it is worth deciding early, because the answer changes the budget rather than the schedule.

The seven exempt areas

The zone is not the whole roof plan. The code lists areas that come out of it before anything is sized:

  1. Areas that must be kept clear for setbacks or access under the Fire Code, the Construction Codes or the Zoning Resolution.
  2. Areas taken up by rooftop structures, mechanical equipment, towers, parapets, guardrails, solar thermal systems and appurtenances.
  3. Areas blocked by stormwater management works, such as cisterns or reuse systems installed under DEP permits.
  4. Terraces on setbacks that come to less than 25% of the building's largest floor plate.
  5. Recreational space that is principal to the use of the building below.
  6. A roof assembly steeper than two units vertical in 12 (17%) that would hold less than 4kW of solar capacity.
  7. Areas where the Department decides site conditions do not favor either a solar system or a green roof.

On a typical New York commercial roof, exceptions 1 and 2 do most of the work: fire-code access paths, the footprint of the mechanical plant, the parapet line and the guardrails. The Department's guidance also notes that rooftop access areas required to be kept clear under Fire Code section 504.4 are excluded, and that recreational space counted as principal to the building's use should be documented, for example on the certificate of occupancy or an approved filing.

How it is filed

Solar and green roof work is filed in DOB NOW. A registered design professional is required for both, and a solar filing also needs an associated electrical filing by a licensed electrician. Any New York State property tax abatement request is submitted as part of that same filing, so if an abatement is part of the project's economics, it belongs in the paperwork from the start rather than as an afterthought.

None of that is roofing work in the ordinary sense, which is the honest answer to a question owners ask us: whether we install the solar system itself. No: we do not install solar panels. What a roofer is certainly responsible for is everything underneath: the membrane, the flashing details around every new penetration or planter, the drainage, and the warranty that has to survive another trade working on top of it.

What it means for a roof replacement budget

Three practical consequences, in the order they usually bite:

  1. Scope creep at the deck. A job planned as a covering replacement can turn into an assembly replacement once the deck is opened and found wet or failed. That is the moment the sustainable roofing zone can enter the project, so the possibility belongs in the bid as a stated condition, not as a surprise.
  2. Loads and layout. Solar arrays and green roof build-ups add weight and fix down to a roof that then has to be maintained under them. Where and how they are mounted changes the number of penetrations, and every penetration is a future leak path unless it is detailed properly.
  3. Maintenance access. A roof carrying planting or panels needs routes to walk, drains that can still be cleared, and a way to get at the membrane below. We would rather plan those paths with you than cut them in later.

How this sits with the other roof rules

The sustainable roofing zone is one of several rules that can apply to the same roof at once:

  • The cool roof requirement sets reflectance values for low-slope roof coverings, with its own exceptions. Green roof areas are excepted from it; exposed membrane is not.
  • Permits: re-roofing above the deck is usually exempt from a Department of Buildings permit, while work that reaches the deck or structure is not. We file the DOB & DOT permits when they are needed, usually 3 days to a week.
  • Energy code: a reroof assembly must be built to the New York City Energy Conservation Code, which is where insulation thickness comes from.
  • Parapets: buildings with a parapet facing a public right-of-way need an annual observation, and a roof covered in new equipment is a roof whose parapet details deserve a fresh look. There is more on that on our apartment building page.

If you are planning work this year

Send us the building address, the roof plan if you have one, and what you know about the deck. We will put in writing which of these rules we think the job touches, what we would do, and where another professional has to be involved. For the replacement itself, see commercial roof replacement.

This guide states the rules as the code and the Department word them. It is not a filing opinion for a specific building: that comes from the registered design professional on the job.

Questions we get asked

Does replacing a worn membrane trigger the sustainable roofing zone?

For an existing building the Department ties the trigger to a full replacement of the roof assembly, deck included, which is a bigger job than renewing the covering over a sound deck. Where the line falls on a particular project is a question for the registered design professional filing the work, so if your roof is at the point where the deck or the insulation layers below might come out, settle that before the scope is priced rather than after.

Solar or a green roof: who chooses?

The code does, by capacity and slope. If a contiguous area of the zone would hold at least 4kW of solar generating capacity as determined by the Department, that area gets at least a solar photovoltaic system. If the area is low-slope and would hold less than 4kW, it gets at least a green roof system instead. Owners can of course do more than the minimum, and a roof can carry both.

Our roof is covered with equipment. Is there anything left to cover?

Often much less than the roof plan suggests. The area under rooftop structures, mechanical equipment, parapets, guardrails and solar thermal gear comes out of the zone, and so do fire-code clear areas and required setbacks. The calculation is done on what remains after those deductions, which is why the measured roof plan matters more than the square footage on a tax record.

Does this replace the cool roof requirement?

No, they are separate rules that can apply to the same roof. A green roof area or an area under equipment is excepted from the reflectance rule in its own right, but the remaining exposed membrane still has to meet it. On a job touching both, the scope should say which areas are being counted for which rule.

Sources

Read from the official code text and the Department's own page on 19 November 2026. Rules change: check the current text before relying on a figure.