Building types
Roofing for apartment and rental buildings
Walk-ups, small elevator buildings and mixed-use rentals across Brooklyn, Queens, the Bronx and Staten Island. The roof is over people's homes, so the plan matters as much as the membrane.
- HoursOpen 24/7
- NYC license2135523-DCWP
- EstimateFree, in writing
What this covers
Apartment buildings are the biggest single block of roof area outside Manhattan. Counting walk-up and elevator apartment buildings in the city's land-use file gives a total of 128,593 buildings holding about 1.63 million homes across the four boroughs this site covers.
| Borough | Apartment buildings | Homes in them |
|---|---|---|
| Brooklyn | 67,058 | 695,890 |
| Queens | 37,514 | 446,441 |
| The Bronx | 22,238 | 461,372 |
| Staten Island | 1,783 | 25,137 |
Queried from PLUTO on NYC Open Data, November 2026 (building classes C and D; counts are tax lots with a building).
Most of that stock is old: citywide, 104,174 walk-up and elevator apartment buildings were built before 1940. An old apartment roof is rarely a clean slate. It has been patched, coated and re-covered over decades, it carries bulkheads, tanks, antennas and vents that arrived at different times, and it drains through pipes that run inside the building. Those three things decide almost every job here.
Where the water actually shows up
On a house, a roof leak appears under the roof. On an apartment building it travels. Before quoting we work backwards from where the tenant sees it:
- The top-floor ceiling. The usual first report. Water entering at a parapet or a drain often runs sideways along the slab first, which puts the stain some distance from the breach.
- The stairwell and bulkhead. Bulkhead walls and doors are a separate roof of their own. Water here runs down the stair, which tenants notice and photograph.
- Around the shaft. Elevator machine rooms, vent shafts and old chimney stacks give water a vertical route through the whole building.
- The line below a drain. An interior leader that has split inside a wall soaks one apartment line from the top down and looks like a plumbing fault.
- The front wall. A blocked scupper or a failed coping joint puts water into the facade, which turns a roofing problem into a masonry one.
This is why we walk the whole roof and photograph it rather than patching the spot above the complaint. The complaint tells us where water came out, not where it came in.
Working over occupied homes
Everything about the schedule follows from the fact that people live below. We agree the access route, the hours and the sequence with the super or managing agent before the first day: which stair and roof hatch we use, where a hoist or container goes, when hot work can happen and which line of the building is worked each day. Residents get told in advance through the office, not by surprise noise at seven in the morning.
Where a leak is active we normally split the job: stop the water first with a temporary repair, then do the permanent work when the roof is dry and the building has had notice. That costs a little more in visits and saves a great deal in damage and complaints.
On warranties, so nothing is assumed: new roofs carry a 2-year labor warranty, plus a 20-year manufacturer warranty on materials. Small repairs carry no written warranty on small repairs. We say that before you hire us.
What you get for the building file
A managed building needs the paperwork as much as the repair, because the next manager, the insurer or a buyer will ask. Every visit leaves:
- Dated photos of each roof area, the parapet, the drains and every piece of equipment
- What was found, ranked: fix now, plan for this year, watch
- What was done on the visit, with before and after photos
- Materials and system used, so the next contractor and the manufacturer both know
- A note of anything on the roof that is not ours: antennas, satellite mounts, tenant installations
Plus the license and insurance papers: our NYC DCWP license is 2135523-DCWP, valid to February 28, 2027, and we carry GL, workers' comp, disability. Details are on the license and insurance page.
The rules that reach an apartment roof
Annual parapet observation
Since 1 January 2024 every building owner with a parapet fronting a public right-of-way must have an observation carried out each year, regardless of the building's height. Detached one- and two-family homes are excepted, as are buildings where a fence or barrier prevents access to the exterior wall. The whole parapet has to be examined from near at hand, which the rule allows from the roof or a fire escape, and it must check that the parapet is plumb within one-eighth of its thickness, that there is no excessive deterioration such as cracks, loose coping stones, failed mortar or spalling, and that anything attached to it (railings, gooseneck ladders, telecoms kit, signs) is stable.
If something unsafe is found, the person observing must notify the Department of Buildings immediately, the owner must put public protection up straight away, and the unsafe condition must be corrected within 90 days. Reports have to include dated photographs and be kept for at least six years.
That duty is the owner's, and the rule allows a range of competent people to do it, including a superintendent or a mason. Our part is practical: when we are on the roof, the parapet gets photographed close up and anything loose, cracked or leaning goes into the report you receive, so the person doing the observation is not starting from nothing.
Source: 1 RCNY §103-15, periodic observation of building parapets.
Facade inspections over six stories
Buildings higher than six stories fall under the Facade Inspection Safety Program: exterior walls and appurtenances must be inspected every five years and a technical report filed with the Department. Citywide there are 5,961 apartment buildings over six stories. Facade work and roof work meet at the parapet and the coping, so if a facade report is due or has flagged the top of the wall, tell us: doing the coping and roof edge once, in one mobilization, is cheaper than twice.
Source: DOB, Facade Inspection Safety Program.
Permits, insulation and the cool roof rule
Re-roofing that stays above the deck is normally exempt from a Department of Buildings permit; opening the deck is not. Adding insulation can bring the Energy Code into the job, and a new or replacement low-slope roof needs a reflective surface under the Building Code, with exceptions such as areas under equipment. A job that goes all the way down to a new deck can also bring the solar and green roof rules into play (see our Local Laws 92 and 94 guide). We state which of these apply to your building in the written scope, and file the DOB & DOT permits when they are needed, usually 3 days to a week.
Sources: 1 RCNY §101-14 · Building Code §1504.9.
Repair, recover or replace
On an apartment building the decision is rarely about the membrane alone. A roof that is dry underneath, with sound insulation and one or two failing details, is a repair or a coating job. A roof with wet insulation, several old layers and ponding that never clears is a replacement, and the tear-off is also the moment to fix drainage and raise bad details. What settles it is a core cut or probe plus the drainage picture, not the age on paper.
Where a building has a leak now, start with repair; where it has several buildings and no plan, start with inspections and let the ranking tell you which roof gets the budget. Your own staff can keep the record between visits with our maintenance checklist.
Where we do this work
Apartment and rental buildings across Brooklyn, Queens the Bronx and Staten Island. Besides apartment buildings, we work on warehouses, factories, stores, offices, apartment buildings, schools, houses of worship and hospitals.
Manhattan co-ops, condos and apartment buildings are handled by our sister site manhattanroofing.nyc, the same company with the same license and insurance.
Questions from owners and managing agents
Who signs off a roof job on a rental building?
Usually the owner or the managing agent, and the scope has to be written for whoever that is. We put the system, the areas covered, the drainage work, the schedule, the payment split and the warranty in writing before anything starts, so the person approving it can compare it with another bid line by line and keep a copy in the building file.
What about the annual parapet observation on our buildings?
That duty sits with the building owner, not with us, and the rule lets a range of competent people carry it out. What we can do is make the roof visit useful for it: we photograph the parapet close up, note loose coping, cracks and leaning, and flag anything attached to it that looks unstable. If something looks unsafe, we say so immediately rather than waiting for a report, because an unsafe parapet has to be made safe straight away.
Can the roof be done without emptying apartments?
Yes. The work stays on the roof, so what has to be planned is access and timing: which stair and hatch we use, where materials are lifted or carried, the hours for noisy or hot work, and notice to residents. On a building with a top-floor leak we often do a temporary repair first so people stop getting wet, then schedule the real work when the roof is dry.
We manage several buildings. Can one roofer handle them all?
That is how this works best. One contractor, one set of insurance papers, one photo report format across the portfolio, and roofs ranked by what needs doing first so a budget can be built around them rather than around whichever building leaked most recently. Buildings in Manhattan go through our sister site, which is the same company.
Send the address and a few roof photos
We will tell you what we see and when we can be on the roof. Estimates are free and come in writing.