Commercial roof replacement
Replacing the roof on a warehouse, store or apartment building is a construction project on top of a working building. We plan the tear-off, the permits and the code requirements before day one, and put every line of it in the bid.
When it is time
One leak is rarely a reason to replace a roof. A pattern is. If you are not sure, start with an inspection: we would rather tell you the roof has five more years than sell you one too early. See commercial roof repair for what a good repair can do.
Recover or tear-off
Installing a new membrane over the existing one saves tear-off and disposal, and on the right roof it is a sound choice. The NYC Building Code limits it, though: no recover over a roof that is water-soaked or deteriorated, and none where two or more roof coverings are already in place (§1511.3.1.1). That is why we test for wet insulation before quoting. Trapping wet insulation under a new membrane shortens its life and can rust the deck. Which system suits the building is set out in our systems comparison guide.
Systems
White single-ply sheets with heat-welded seams. A common choice for large, open roofs, and the white surface meets the cool-roof rule on its own.
Rubber membrane in wide sheets with few seams. Usually black, so in NYC it needs a reflective coating or a white EPDM where the cool-roof rule applies.
Two or more asphalt plies, torch-applied or self-adhered. Takes foot traffic well; a reflective cap sheet or coating handles the cool-roof rule.
We pick the product for each job once the roof has been surveyed, and the written scope names it. If a roof is still sound and dry, a roof coating can sometimes put off a replacement.
Comparing bids
Bids that all say "new roof" can cover jobs with little in common. These lines make them comparable, and the deck line is the one that prevents the classic surprise after tear-off.
| Line | What it should say |
|---|---|
| Tear-off | How many existing layers come off, and disposal |
| Deck | A unit price per sq ft for any rotten or rusted deck found after tear-off |
| Insulation | Type, thickness and R-value; tapered insulation where water needs help reaching the drains |
| Membrane | System and manufacturer, by name |
| Details | Drains, scuppers, curbs, pipe boots, edge metal, parapet flashing |
| Surface | Reflective cool-roof surface where the code requires it |
| Permits | Who files which DOB and DOT permits, and whether fees are included |
| Schedule | Start date, working hours, daily watertight closing, cleanup |
| Warranty | Labor, material and any manufacturer guarantee, each named separately |
| Payment | The payment split and what triggers each payment |
Our payment terms: half when work starts, half when it is finished.
NYC rules
We work out which of these apply during the survey, so the bid already includes them.
Ponding water is behind a large share of commercial roof failures, and a replacement is the cheapest moment to cure it. With the old roof off, we can lay tapered insulation boards that pitch water to each drain, build crickets behind rooftop units and between drains, lower or reset drain bowls that sit too high, and enlarge or add scuppers and overflows at the parapet. On a warehouse with a long, flat span, this often matters more than which membrane goes on top. Expect it as a separate line in the bid, with a drawing of the new slopes, so you can see where every gallon is meant to go and judge whether the price for it is fair.
Most of a replacement happens on top, but the building feels it. We plan these with the manager or owner before we start:
The job, step by step
Walk the roof, test for wet insulation, measure, photograph every detail.
Scope line by line, the system, the price and the schedule.
Filed when the work needs them; ours usually take 3 days to a week.
Notice to tenants, crane or hoist day, container spot, HVAC intakes covered.
Only as much as can be closed watertight the same day.
Insulation, membrane, then flashing at walls, curbs, drains and edges.
Final walk with you, photos, cleanup and warranty paperwork.
Warranty
| Type | Covers | On our new roofs |
|---|---|---|
| Contractor labor | Workmanship: seams, flashing, details | 2-year labor warranty, plus a 20-year manufacturer warranty on materials |
| Manufacturer material | Defects in the membrane itself | Included in the line above |
Some manufacturers also sell whole-system guarantees backed by their own inspection. If any bid you receive includes one, it should name the manufacturer, the term and the inspection it depends on.
Price depends on roof size, how many layers come off, deck condition, insulation thickness, the system, access for materials, and which code requirements apply. As a budget figure, roofing work here runs roughly $10 to $30 per square foot, depending on the system and the building, and a straightforward flat-roof replacement sits at around $13 per square foot, covering tearing off the old roof, new insulation, a new roof layer and new flashing at the roof joints. The exact price comes after the survey, in writing, for free, because the site moves the number: the building's location, how materials get up to the roof, how debris comes down, the space around the building and the roof's condition. Our guide to commercial roof replacement cost breaks the figure down and shows how to compare bids.
It gets replaced before anything goes on top, because new roofing over bad deck fails early. A good bid sets a price per square foot for this in advance, so nobody negotiates with the roof open. We photograph it and show you before we proceed.
Not white exactly, but reflective: low-slope roofs need a surface that meets the Building Code's reflectance and emittance numbers, which white membranes and many coatings and cap sheets do. Some areas, like under equipment, are exempt.
Line them up against the table above. If one bid is far cheaper, look for what is missing: layers torn off, insulation thickness, the deck allowance, flashing details or permits.
Often, yes, when the roof divides naturally at walls, expansion joints or roof levels. Each section must tie in watertight to the old roof, and a phase smaller than 500 sq ft that is also less than 50% of the roof is treated differently under the cool-roof rule. We show the split options in the bid.
We will tell you what we see and when we can be on the roof. Estimates are free and come in writing.