Commercial roof replacement

A new commercial roof, planned around the people inside

Replacing the roof on a warehouse, store or apartment building is a construction project on top of a working building. We plan the tear-off, the permits and the code requirements before day one, and put every line of it in the bid.

  • HoursOpen 24/7
  • NYC license2135523-DCWP
  • EstimateFree, in writing

When it is time

Signs a repair will not be enough

  • Leaks keep coming back in new places after each repair
  • Insulation is wet across large areas (soft spots underfoot, moisture readings)
  • Seams and flashing are failing everywhere, not in one spot
  • Two roofs are already on the building, so another layer is not allowed
  • The deck is rusting, sagging or soft
  • Blisters, cracks and bare spots across most of the surface, not just one corner

One leak is rarely a reason to replace a roof. A pattern is. If you are not sure, start with an inspection: we would rather tell you the roof has five more years than sell you one too early. See commercial roof repair for what a good repair can do.

Worn flat roof with several seams lifting and split, shortly before the old layers were torn off
Seams opening across a whole roof, not in one spot: a roof our crew replaced in the outer boroughs.

Recover or tear-off

Going over the old roof: what the code allows

Installing a new membrane over the existing one saves tear-off and disposal, and on the right roof it is a sound choice. The NYC Building Code limits it, though: no recover over a roof that is water-soaked or deteriorated, and none where two or more roof coverings are already in place (§1511.3.1.1). That is why we test for wet insulation before quoting. Trapping wet insulation under a new membrane shortens its life and can rust the deck. Which system suits the building is set out in our systems comparison guide.

Systems

Choosing the membrane

TPO or PVC

White single-ply sheets with heat-welded seams. A common choice for large, open roofs, and the white surface meets the cool-roof rule on its own.

Watch for
Foot traffic around rooftop units; walkway pads help

EPDM

Rubber membrane in wide sheets with few seams. Usually black, so in NYC it needs a reflective coating or a white EPDM where the cool-roof rule applies.

Watch for
Seam tape and perimeter details on older roofs

Modified bitumen

Two or more asphalt plies, torch-applied or self-adhered. Takes foot traffic well; a reflective cap sheet or coating handles the cool-roof rule.

Watch for
Torch work near combustibles needs FDNY-certified crew

We pick the product for each job once the roof has been surveyed, and the written scope names it. If a roof is still sound and dry, a roof coating can sometimes put off a replacement.

Comparing bids

What a commercial roofing bid should spell out

Bids that all say "new roof" can cover jobs with little in common. These lines make them comparable, and the deck line is the one that prevents the classic surprise after tear-off.

LineWhat it should say
Tear-offHow many existing layers come off, and disposal
DeckA unit price per sq ft for any rotten or rusted deck found after tear-off
InsulationType, thickness and R-value; tapered insulation where water needs help reaching the drains
MembraneSystem and manufacturer, by name
DetailsDrains, scuppers, curbs, pipe boots, edge metal, parapet flashing
SurfaceReflective cool-roof surface where the code requires it
PermitsWho files which DOB and DOT permits, and whether fees are included
ScheduleStart date, working hours, daily watertight closing, cleanup
WarrantyLabor, material and any manufacturer guarantee, each named separately
PaymentThe payment split and what triggers each payment

Our payment terms: half when work starts, half when it is finished.

NYC rules

Code requirements a commercial replacement brings

  • DOB permit when the deck is involved. Under 1 RCNY §101-14, replacing the membrane and insulation above the deck is exempt unless the Energy Code calls for more insulation; work that includes the deck or sheathing needs a permit.
  • Insulation. When a replacement exposes the insulation or sheathing, the NYC Energy Conservation Code (C503.3.1) requires the roof to be insulated to current levels.
  • Cool roof. Low-slope roofs need a surface with high solar reflectance and emittance (Building Code §1504.9), with exceptions such as areas under equipment. Our cool roof guide lists the values and all eight exceptions.
  • Local Laws 92 and 94 (solar and green roofs). If an existing building is replacing its entire roof deck or roof assembly, the sustainable roofing zone must get solar, a green roof or both. A registered design professional files it in DOB NOW. Details on the DOB page, and what counts as a trigger in our guide to Local Laws 92 and 94.
  • Torch work. Torch-applied roofing requires an FDNY G-60 certificate holder and a fire guard.

We work out which of these apply during the survey, so the bid already includes them.

Fix the drainage while the roof is open

Ponding water is behind a large share of commercial roof failures, and a replacement is the cheapest moment to cure it. With the old roof off, we can lay tapered insulation boards that pitch water to each drain, build crickets behind rooftop units and between drains, lower or reset drain bowls that sit too high, and enlarge or add scuppers and overflows at the parapet. On a warehouse with a long, flat span, this often matters more than which membrane goes on top. Expect it as a separate line in the bid, with a drawing of the new slopes, so you can see where every gallon is meant to go and judge whether the price for it is fair.

Keeping the building running during the job

Most of a replacement happens on top, but the building feels it. We plan these with the manager or owner before we start:

  • Tenant notice with dates, hours and who to call.
  • Hoist or crane days, container placement and any sidewalk or street permits (we handle DOB & DOT permits).
  • Smell and dust: HVAC fresh-air intakes covered or shut during torch or adhesive work.
  • Watertight every night: no more is opened than can be closed the same day, and the forecast decides the plan.
  • Access: loading docks, entrances and store hours kept clear.

The job, step by step

From survey to warranty papers

  1. 01

    Survey

    Walk the roof, test for wet insulation, measure, photograph every detail.

  2. 02

    Written bid

    Scope line by line, the system, the price and the schedule.

  3. 03

    Permits

    Filed when the work needs them; ours usually take 3 days to a week.

  4. 04

    Prep with the building

    Notice to tenants, crane or hoist day, container spot, HVAC intakes covered.

  5. 05

    Tear-off in sections

    Only as much as can be closed watertight the same day.

  6. 06

    New roof

    Insulation, membrane, then flashing at walls, curbs, drains and edges.

  7. 07

    Close-out

    Final walk with you, photos, cleanup and warranty paperwork.

Warranty

The warranties on our new roofs

TypeCoversOn our new roofs
Contractor laborWorkmanship: seams, flashing, details2-year labor warranty, plus a 20-year manufacturer warranty on materials
Manufacturer materialDefects in the membrane itselfIncluded in the line above

Some manufacturers also sell whole-system guarantees backed by their own inspection. If any bid you receive includes one, it should name the manufacturer, the term and the inspection it depends on.

What it costs

Price depends on roof size, how many layers come off, deck condition, insulation thickness, the system, access for materials, and which code requirements apply. As a budget figure, roofing work here runs roughly $10 to $30 per square foot, depending on the system and the building, and a straightforward flat-roof replacement sits at around $13 per square foot, covering tearing off the old roof, new insulation, a new roof layer and new flashing at the roof joints. The exact price comes after the survey, in writing, for free, because the site moves the number: the building's location, how materials get up to the roof, how debris comes down, the space around the building and the roof's condition. Our guide to commercial roof replacement cost breaks the figure down and shows how to compare bids.

Questions owners and managers ask

What happens if rotten deck is found after tear-off?

It gets replaced before anything goes on top, because new roofing over bad deck fails early. A good bid sets a price per square foot for this in advance, so nobody negotiates with the roof open. We photograph it and show you before we proceed.

Does a new commercial roof have to be white in NYC?

Not white exactly, but reflective: low-slope roofs need a surface that meets the Building Code's reflectance and emittance numbers, which white membranes and many coatings and cap sheets do. Some areas, like under equipment, are exempt.

How should we compare two roofing bids?

Line them up against the table above. If one bid is far cheaper, look for what is missing: layers torn off, insulation thickness, the deck allowance, flashing details or permits.

Can the roof be replaced in sections over two budget years?

Often, yes, when the roof divides naturally at walls, expansion joints or roof levels. Each section must tie in watertight to the old roof, and a phase smaller than 500 sq ft that is also less than 50% of the roof is treated differently under the cool-roof rule. We show the split options in the bid.

Send the address and a few roof photos

We will tell you what we see and when we can be on the roof. Estimates are free and come in writing.