Roof coatings that buy a sound roof more years

A coating is a liquid membrane rolled or sprayed over an existing roof. On the right roof it stops leaks, reflects summer heat and puts off a tear-off. On the wrong roof it hides a problem for one season. We test which one you have before quoting.

  • HoursOpen 24/7
  • NYC license2135523-DCWP
  • EstimateFree, in writing

Candidate test

Is your roof a good candidate for a coating

Usually a good fit
  • Membrane still attached and mostly intact, with leaks you can count on one hand
  • Insulation dry across the roof (checked, not guessed)
  • Water drains off within a day or two of rain
  • You want the roof to last several more years without a tear-off
Fix or replace first
  • Wet insulation over large areas: a coating seals the water in
  • Membrane split, shrunk or pulling away along many seams
  • Deep ponding that sits for days because drains are too high or blocked
  • A deck that is soft or rusting

If the roof falls in the right-hand column, see commercial roof repair or commercial roof replacement. Sometimes the answer is both: repair or replace the worst areas, then coat the rest.

Chemistry

Coating types for commercial roofs

No coating is best everywhere. The choice depends on the existing roof, how water drains, and how much foot traffic the roof gets.

TypeStrengthsWatch out for
SiliconeHolds up to standing water better than most coatings; very weather-resistantNew silicone sticks well only to silicone, so future recoats stay silicone; can be slippery when wet
AcrylicWater-based, bright white, usually the lower-cost optionNeeds good drainage; not for areas where water sits
Polyurethane (urethane)Tough under foot traffic and impact; often used as a base coatUsually topped with a UV-stable coat; higher cost
Aluminum / asphalticTraditional choice over older asphalt and mod-bit roofs; reflects sunlightLower reflectance than white coatings; check against the cool-roof rule

We choose the coating product for each roof after the survey. Whichever coating we use, it must be compatible with the membrane underneath, and the manufacturer's system rules decide primer, reinforcement and thickness.

Application

How a coating job is done properly

Most coating failures come from skipped prep or a coat that is too thin. These steps are where the money in a coating job should go.

  1. 01

    Moisture survey

    Find wet insulation before anything else; wet areas are cut out and replaced.

  2. 02

    Repairs

    Open seams, loose flashing, blisters and drains fixed with matching material.

  3. 03

    Cleaning

    Pressure-wash the whole roof; coatings fail on dirt and chalk.

  4. 04

    Adhesion test

    Test patches on the actual roof decide whether a primer is needed.

  5. 05

    Reinforce details

    Fabric-reinforced coating at seams, flashing, drains and penetrations.

  6. 06

    Base and top coats

    Applied to the thickness the manufacturer specifies, measured as we go.

  7. 07

    Close-out

    Thickness readings, photos and warranty paperwork.

NYC rules

Coatings and New York City requirements

  • Cool roof: When half the roof or more, or 500 sq ft or more, is recovered or replaced, low-slope roofs must meet reflectance and emittance minimums under Building Code §1504.9 and §1511.1. A white coating with a Cool Roof Rating Council rating is the usual way to meet it.
  • Permits: Work limited to the roof covering above the deck is on the DOB's list of work exempt from a permit (1 RCNY §101-14), unless the Energy Code calls for added insulation.
  • Solar and green roof laws: Local Laws 92 and 94 only kick in when the whole deck or the whole roof build-up comes off and is rebuilt (DOB). A coating leaves the existing roof in place, so it stays outside them.
  • VOC limits: Roof coatings sold and used in New York State must meet the state's limits on volatile organic compounds (6 NYCRR Part 205).

Owners of non-profit, affordable-housing and some community buildings should also look at NYC CoolRoofs, a city program that installs reflective coatings at no or low cost on roofs already in good condition.

Coating warranties

Coating manufacturers offer system guarantees whose length depends on the system and on coating thickness. GAF, for example, lists limited guarantees of 10 to 20 years for its liquid-applied systems, tied to contractor certification. A guarantee like that usually requires the manufacturer to approve the roof, the prep and the installer. Separate from any manufacturer document, our own terms on coating work are a 3-year warranty on silicone coating jobs.

Planning for the next coat

A coating wears thinner every year under sun and weather, so treat it as a maintained layer, not a one-time fix. Keep the thickness readings from the job, have the roof looked at on a schedule, and budget for a fresh top coat while the old one is still intact underneath. Recoating a sound coating is a much smaller job than the first application, because the moisture survey, repairs and base coat are already done. Let it wear through to the old roof and you are back to full prep.

What a coating costs compared with a new roof

A coating skips tear-off, disposal and new insulation, which is why it usually costs a fraction of a replacement on the same roof. The price moves with the repairs needed first, the coating type, the thickness the system requires, and access for equipment. We price it after the moisture survey, and the site counts as much as the roof: the building's location, how materials get up to the roof, how debris comes down, the space around the building and the roof's condition.

Questions about commercial roof coatings

Can a coating go over a roof with standing water?

Some silicone coatings are made to tolerate ponding, but the better fix is to stop the water from sitting: clear or lower drains, or add tapered insulation in the low spots before coating. Water that never drains shortens any coating's life.

Silicone or acrylic for a warehouse roof?

On a large, flat warehouse roof with low spots, silicone usually wins. On a roof that drains well and has little traffic, acrylic can do the job for less. If the roof was coated before, the old coating often decides: silicone over silicone, acrylic over acrylic.

Does a reflective coating satisfy NYC's cool roof requirement?

A white coating rated by the Cool Roof Rating Council with high enough reflectance and emittance does. Aluminum and gray coatings often fall short, so check the rating before buying. The thresholds and every exception are set out in our guide to the NYC cool roof requirements.

Can a coating be applied while the building is in use?

Yes. The work is all on the roof, with no tear-off noise. Plan for odor near fresh-air intakes on some products, and for dry weather: coatings need several dry hours, and some need warm temperatures, which shortens the season in New York.

Send the address and a few roof photos

We will tell you what we see and when we can be on the roof. Estimates are free and come in writing.