Open 24/7 for leaks and roof emergencies Call (929) 412-6597

Building types

Roofing for schools, houses of worship and hospitals

Institutions buy roofs differently. A committee or board approves the work, the budget follows a fiscal year or a fundraising campaign, and the building has a calendar the roofer has to fit into, not the other way round.

  • HoursOpen 24/7
  • NYC license2135523-DCWP
  • EstimateFree, in writing

Big roofs, many of them old

Across Brooklyn, Queens, the Bronx and Staten Island, the city's land-use file lists nearly 8,000 lots used by schools, houses of worship and health buildings, holding close to 300 million square feet. Schools alone have more floor area than any other non-residential type in these boroughs.

BuildingLotsFloor area (sq ft)What stands out
Schools and colleges2,370185.7M1,068 have 50,000 sq ft or more
Houses of worship4,63144.6MTwo in three built before 1940; about 1 in 26 under landmark rules
Hospitals and health92365.5M276 have 50,000 sq ft or more

Two facts shape the work. Many of these buildings are old and were extended in stages, so one property can have a dozen roof areas of different ages and systems. And a large share of them, especially houses of worship, are more likely than ordinary commercial buildings to fall under landmark rules: about one religious lot in 26, against about one store building in 108.

Queried from PLUTO on NYC Open Data (classes W, M and I; historic district and landmark flags), November 2026.

Working around the calendar

When the work can happen

Schools

Summer break and long holidays are when the noisy work happens. A replacement planned in spring can be done in July and August; one planned in June usually cannot.

Houses of worship

Services, holy days, weddings and funerals come first. We work around the weekly schedule and keep the main entrance clear on the days that matter.

Hospitals and clinics

They never close. Work is planned with the facilities team around patient areas, air intakes and the hospital's own construction rules, often section by section.

Houses of worship

Churches, synagogues and mosques combine a steep main roof with flat roofs over aisles, halls, rectories and later additions, plus gutters hidden behind parapets. The flat sections, gutters, parapets and the joints between roof areas are where we usually find the leak. Our repair work traces it to the source and documents it, so the congregation knows what it is paying for.

If the building is a landmark or sits in a historic district, work that changes what is visible from the street may need Landmarks Preservation Commission review first. A flat roof hidden behind a parapet rarely does; new equipment or railings that show above it can. We tell you which applies before the scope is final.

Schools

School buildings are usually large, flat-roofed and full of equipment: gym and auditorium roofs with long spans, classroom wings added over decades, skylights, exhaust fans from science rooms and kitchens. Roof access must be kept away from students, materials need a secure staging area, and the work window is short. The written scope lists each roof area separately, so a school can do the worst sections first and plan the rest over the next budget years.

Hospitals and health buildings

Hospitals, clinics and care homes cannot stop, and dust in the wrong place is a patient safety problem. Construction in health facilities runs under an infection control risk assessment, which the American Society for Health Care Engineering describes as protecting "patients, staff, workers, and visitors" from infectious disease during the work. On a roof that means paying attention to air intakes, generator exhaust and the rooms directly below, and following the facility's own permit and escort rules.

Source: ASHE ICRA 2.0 toolkit.

What the board receives

  • A survey of every roof area with dated photos, ranked: fix now, plan for next year, watch.
  • A written scope and price per area, so the work can be phased to the budget.
  • Our license and insurance papers for the file. If the institution must be named on the certificate, we can name your company as additional insured on our certificate, usually within 1 day.
  • The warranty in writing: a 2-year labor warranty, plus a 20-year manufacturer warranty on materials on new roofs; small repairs carry no written warranty on small repairs.
  • Payment terms stated up front: half when work starts, half when it is finished.

Price is set after the survey, not per square foot over the phone. On an institutional site, the building's location, how materials get up to the roof, how debris comes down, the space around the building and the roof's condition matter as much as the roof itself.

Rules to know

Re-roofing above the deck is usually exempt from a DOB permit; work on the deck or structure is not. When permits are needed we file the DOB & DOT permits, usually 3 days to a week. A replaced low-slope roof needs a reflective surface, with exceptions (see our cool roof guide), and replacing the whole roof assembly, deck included, can bring green or solar roof requirements into the picture; our Local Law 92/94 guide explains when. Where a parapet faces the street, the owner's yearly parapet observation can be paired with a roof visit.

Sources: 1 RCNY §101-14 · Building Code chapter 15 · 1 RCNY §103-15.

We cover Brooklyn, Queens, the Bronx and Staten Island. See also commercial roof replacement and inspection visits, booked when you want them with no contract.

Questions from boards, clergy and facilities staff

Our church roof leaks but the building is old. Where does the water usually come in?

On most churches and synagogues it is not the big sloped roof but the places where roofs meet: valleys, gutters behind parapets, the flat sections over side aisles and later additions, and the joints around towers. Built-in gutters that overflow inside the wall are a classic. We start by finding the actual entry point, with photos you can show the committee.

Can the work be done over the summer while the school is closed?

Yes, and that is the best time for it, but only if it is planned early. Material lead times, any permit and the approval cycle of a school board all take time, so the survey and written scope should be done in the spring for a July start.

Can our board compare your scope with other bids?

That is what the written scope is for. It lists the areas, the system and product, what comes off and what goes on, drainage and flashing work, the schedule, the payment terms and the warranty, so each bid can be read line by line. We will also answer the committee's questions in person or in writing.

Is roof work on a hospital different from any other building?

Yes. Hospitals run an infection control risk assessment before construction work, and roof work is part of it when it is near air intakes or above patient areas. In practice that means agreed work zones and hours, dust control, protected intakes and coordination with the facilities department at every step.

Send the address and a few roof photos

We will tell you what we see and when we can be on the roof. Estimates are free and come in writing.