Schools
Summer break and long holidays are when the noisy work happens. A replacement planned in spring can be done in July and August; one planned in June usually cannot.
Building types
Institutions buy roofs differently. A committee or board approves the work, the budget follows a fiscal year or a fundraising campaign, and the building has a calendar the roofer has to fit into, not the other way round.
Across Brooklyn, Queens, the Bronx and Staten Island, the city's land-use file lists nearly 8,000 lots used by schools, houses of worship and health buildings, holding close to 300 million square feet. Schools alone have more floor area than any other non-residential type in these boroughs.
| Building | Lots | Floor area (sq ft) | What stands out |
|---|---|---|---|
| Schools and colleges | 2,370 | 185.7M | 1,068 have 50,000 sq ft or more |
| Houses of worship | 4,631 | 44.6M | Two in three built before 1940; about 1 in 26 under landmark rules |
| Hospitals and health | 923 | 65.5M | 276 have 50,000 sq ft or more |
Two facts shape the work. Many of these buildings are old and were extended in stages, so one property can have a dozen roof areas of different ages and systems. And a large share of them, especially houses of worship, are more likely than ordinary commercial buildings to fall under landmark rules: about one religious lot in 26, against about one store building in 108.
Queried from PLUTO on NYC Open Data (classes W, M and I; historic district and landmark flags), November 2026.
Working around the calendar
Summer break and long holidays are when the noisy work happens. A replacement planned in spring can be done in July and August; one planned in June usually cannot.
Services, holy days, weddings and funerals come first. We work around the weekly schedule and keep the main entrance clear on the days that matter.
They never close. Work is planned with the facilities team around patient areas, air intakes and the hospital's own construction rules, often section by section.
Churches, synagogues and mosques combine a steep main roof with flat roofs over aisles, halls, rectories and later additions, plus gutters hidden behind parapets. The flat sections, gutters, parapets and the joints between roof areas are where we usually find the leak. Our repair work traces it to the source and documents it, so the congregation knows what it is paying for.
If the building is a landmark or sits in a historic district, work that changes what is visible from the street may need Landmarks Preservation Commission review first. A flat roof hidden behind a parapet rarely does; new equipment or railings that show above it can. We tell you which applies before the scope is final.
School buildings are usually large, flat-roofed and full of equipment: gym and auditorium roofs with long spans, classroom wings added over decades, skylights, exhaust fans from science rooms and kitchens. Roof access must be kept away from students, materials need a secure staging area, and the work window is short. The written scope lists each roof area separately, so a school can do the worst sections first and plan the rest over the next budget years.
Hospitals, clinics and care homes cannot stop, and dust in the wrong place is a patient safety problem. Construction in health facilities runs under an infection control risk assessment, which the American Society for Health Care Engineering describes as protecting "patients, staff, workers, and visitors" from infectious disease during the work. On a roof that means paying attention to air intakes, generator exhaust and the rooms directly below, and following the facility's own permit and escort rules.
Source: ASHE ICRA 2.0 toolkit.
Price is set after the survey, not per square foot over the phone. On an institutional site, the building's location, how materials get up to the roof, how debris comes down, the space around the building and the roof's condition matter as much as the roof itself.
Re-roofing above the deck is usually exempt from a DOB permit; work on the deck or structure is not. When permits are needed we file the DOB & DOT permits, usually 3 days to a week. A replaced low-slope roof needs a reflective surface, with exceptions (see our cool roof guide), and replacing the whole roof assembly, deck included, can bring green or solar roof requirements into the picture; our Local Law 92/94 guide explains when. Where a parapet faces the street, the owner's yearly parapet observation can be paired with a roof visit.
Sources: 1 RCNY §101-14 · Building Code chapter 15 · 1 RCNY §103-15.
We cover Brooklyn, Queens, the Bronx and Staten Island. See also commercial roof replacement and inspection visits, booked when you want them with no contract.
On most churches and synagogues it is not the big sloped roof but the places where roofs meet: valleys, gutters behind parapets, the flat sections over side aisles and later additions, and the joints around towers. Built-in gutters that overflow inside the wall are a classic. We start by finding the actual entry point, with photos you can show the committee.
Yes, and that is the best time for it, but only if it is planned early. Material lead times, any permit and the approval cycle of a school board all take time, so the survey and written scope should be done in the spring for a July start.
That is what the written scope is for. It lists the areas, the system and product, what comes off and what goes on, drainage and flashing work, the schedule, the payment terms and the warranty, so each bid can be read line by line. We will also answer the committee's questions in person or in writing.
Yes. Hospitals run an infection control risk assessment before construction work, and roof work is part of it when it is near air intakes or above patient areas. In practice that means agreed work zones and hours, dust control, protected intakes and coordination with the facilities department at every step.
We will tell you what we see and when we can be on the roof. Estimates are free and come in writing.